1) what is the difference between development length &
overlap length ? 2) why extras are provided at top and
bootom in a beam of slab? 3) why stirrups are provided at
0.3l at supports and 0.4l at center? 4) is column a
compression memeber if yes how & beam is which type of
memeber?
Answer Posted / 1986
development length
1. The minimum length of straight reinforcing bar or
reinforcing rod which is required to anchor it in concrete.
2. The length of embedded reinforcement required to develop
the design strength at a critical section.
| Is This Answer Correct ? | 44 Yes | 6 No |
Post New Answer View All Answers
how much shouid be the rate for ready mix concrete per cubic meter
How cracks in concrete can be avoided?
Which Types Of Bricks ?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
How to activate isometric axes in cad?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
what is mean by c32/40s concrete class
what course did you consider thinking before you enrolled in college?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
how i convert mm into standard wire guage (SWG)no.
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
TELL ME THE EQUATION FOR OGEE SPILLWAY
Why should you show Client/Engineer activities clearly on the project plan?