What is Meant by Load factor in Power plant?
Answer Posted / zan
In electrical engineering, load factor is the average power
divided by the peak power, over a period of time. The peak
may be a theoretical maximum, rather than a measured
maximum.
In the electricity industry, load factor is a measure of
the output of a power plant compared to the maximum output
it could produce.
The two commonest definitions are:
• the ratio of average load to capacity
• The ratio of average load to peak load in a period.
Assuming the first definition, a higher load factor is
better:
• A power plant may be less efficient at low load
factors.
• A high load factor means fixed costs are spread
over more kWh of output.
• A high load factor means greater total output.
| Is This Answer Correct ? | 21 Yes | 4 No |
Post New Answer View All Answers
acb(AIR CIRCUIT BREAKER)NOT CHARGING AUTO
how to synchronize 3 phase slip ring induction motors of different ratings.
how to calculate the earth fault current
How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?
A Generator is in running condition and Rotor earth fault alarm is coming.How to check on line(i.e in running condition) whether there is actual earth fault in rotor or not.
Differentiate between ideal and non ideal current sources?
In an ACB shunt trip coil and undervoltage coil operated normally( breaker open and charged). But closing coil not operating untill manually discharge and recharging. Any help.
Can any answer me ,What will be the range of C.T coil for L&T energy meter EM301 used for 180 kva DG set
what is the role of energy meter in distribution system ?
Why single phase induction motors are not self starting ?
Work done in a free expansion process is
What is the basic principle of operation of alternators/dc generators?
can any one suggest paper presentation topies for electrical engg?
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???
concept of busbar and load dispatching..?