How transformer neutralshould earthed ? Transformer neutral
connected to earth mat in substations, right or wrong ?
Answer Posted / prasad
Transformer is connected to nutral with a strip separatley
and this neutral is conected ground seprately
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
the grid connection required for a 50 MegaWatt fotovoltaic powerplant is higher or lower than 35kv (high or medium tension)?
How dia computation perfomed in cold rolling mills .
describe the Tranformer testing procedure
please send me previose rrb junior engineer qustion papers
What is process of anneling transformer core
How could I get a certificate of competency as Electrical Supervisor? I have completed By BTech in Electrical this year(2012) for VJTI Mumbai Maharashtra. Is it compulsory to be produced while joining?
What aturn on methods of scr?
what is ic 01,ic 06 ?is it types of cooling?
Why an ac solenoid valve attract the plunger even though we interchanges the terminal? Will the poles changes?
Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV
what is R Core Transformer. how it differs from normal transformers. dont search in net and post the answer.
How to improve fuel cell in a distribution system?
What is reactance, reluctance,capistance, pls give answeer in hinglish and be simply Jo asani we smajh m aa jaye
i am an maintenance engineer. one distribution board have 5 feeder. recently its ELR trips frequently, but it take some times after trip( 10min,20min..)but 3 feeder no load. two feeder only loaded. i checked one feeder IR value all values are above 50Mohm.but B phase to Earth is only 9Mohm.any problem about low value
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.