wat happens to the foundation when only live & dead loads
are considered( wind load is excluded) during the design of
tall structures.
options are:
a)only settlement in the internal structure and not external
structure
b)only settlement in the external structure and not internal
structure
c)no differential settlement
d)none of the above
Answer Posted / pramod
c
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to do bbs in excel format
How to come 1.54 from dry to wet concrete?
Please tell me vasthu room sizes. Thanks.
Civil engineering related
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
What are the RISKS during the project construction?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
why top layer of block work shoud be full size if any cut block adjustable than another layer?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Which tests are performed on soil to decide the type of foundation to be provided.