Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why microprocessors are named as 8085 ,8086 etc?
what's the reason for this???

Answer Posted / shyam

thanks sir,at least u tried to explain me the things that our lecturers haven't explained.
thanx....

Is This Answer Correct ?    11 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating

2377


What are the types of instrument transformer?

1135


Tell me the reason of connecting domestic t/f primary in star or delta,and also secondary side.

1939


Difference between RCCB, RCBO and ELMCB.

4046


working principle a.v.r. ?

2364


How to design a Unit auxiliary transformer for a power house having a unit of 65 MW and Generating voltage of 11 KV and Secondary voltage of 433V

2105


What should be the percentage increase in length of the dead end clamp for bus bar conductor (Hawthorn) after hydraulic pressing and what should be the applied pressure?

1900


What are the basic components of the feedback control system?

1011


is there any lightning by passer is arranged in ship like buildings?

1901


What are dcs and plc?

1058


I want to know all basics of electrical engineering

1821


what is ground fault in ACB?

2051


How does PLC work for sychronising of Two or more DG sets?

2046


If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables

1416


If 22 KV HT line, Current transformer is 25/5 then how to calculate multiplying factor.

1065