HOE DO U IMPLIMENT SCHEDULING IN INFORMATICA?
Answer Posted / nisith
I think no one know abt Informatica DAC-Its a scheduling
tool of informatica like control M
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
Which transformation is needed while using the Cobol sources as source definitions?
How many dimensions are there in informatica?
What is domain and gateway node?
What is rank index in rank transformation?
How to elaborate powercenter integration service?
Briefly explain the aggregator transformation?
Which means the first record should come as last record and last record should come as first record and load into the target file?
If i have source as flat file. how can i store the header and trilor into one target and data into one more target. |------>target1(header+trailor) source------ |------>target2(data) can any one please help me
Define pmcmd command?
can anyone suggest best free Talend data integration training online
if i hv 6 table as source table but can i make 12 as a dim table and 6 as fact table belongs to that src table.
Is it possible to create multiple domains on a single Informatica server?
What is the format of informatica objects in a repository? What are the databases that informatica can connect to windows?
What are mapplets?
Which transformation should we use to normalise the COBOL and relational sources?