Answer Posted / wasim.warud
A Check is weekly or daily check , ( normally cleaning
,checking for a loose connection and leakage is done in this).
B Check is done after 500 or 300 running Hrs. OR 6 month
from the date date of commissioning which ever earlier ,
(Lube oil,oil filter,diesel filter,air filter change done in
this)
C Check is done 1500 / 1000 running Hrs or 1 year from the
date of commisioning ( Lube oil,oil filter,diesel filter,air
filter change ,coolant topup , battery ,tightning of nut
bolts etc. Covered in this check)
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
How can calculate the rating of a servo stabilizer for given a specific load
What are the types of windings present in the ceiling fan? What winding will be effective first when we started the fan?What are the resistance and inductance ratios comparatively at the initial speed and full speed of the fan?
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???
Why we use circular(Stepped) cross section in transformer core?
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
Dear All, I am new in construction company , my boss ask a question at time of interview , If we have 60MW generation and Single Power Transformer step-up we have. if CMR 50/60MVA , ONAN, ONAF respectively , is it sufficient or not ? for that much power to transfer,
Types of test in Switchgears, MCC, NGR and DB's how it should be procced. Can anyone give me the details here or email me to pasuvaraj.k@gmail.com
What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)
what is load vs Torque curve & why it is used?
Define branch?
Merits & Demarits of Oil circuit & Air circuit breakers ?
1 Ton is equal to how many watts?
Define pole pitch?
Differentiate between ideal and non ideal current sources?