Answer Posted / indushri haridas
1:2:4
| Is This Answer Correct ? | 10 Yes | 6 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Define Who designed the city of Washington DC?
which red: used in roof teping, then use only cement
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is the crank length in the slab?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
Which tests are performed on soil to decide the type of foundation to be provided.