Is there any change in IS code regarding location of laps
for column reinforcement.
Can we place staggered alls for column reinfr.at one floor
lvl?
Answer Posted / modipraveen
Yes its mentioned, It should be l/3 from slab level below or
above but should not provide at junction of beam and slab.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Define aligned dimension?
How is make concrete cube?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What are the advantages and disadvantages of lead products in construction?
how many type of admixtures for water stored structure?
what is the coefficient for running feet to cft coversion both area and price
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
punj loyed and sapurjl palanjl
When was the first motorway built in england?
pls give me ans to ACT formula cube testing porpuse
Why should pumping be not used in case of concreting work?
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
significance of specific surface area of particles?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire