On concrete surface 1sq.ft area hacking no's of hack?
Answer Posted / modipraveen
Its should not less than 1" to 1" for Sq.ft 144 no will come
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Can we apply curing compound on ceiling (slab Bottom)
what does the track parameter mean in staad.pro?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
Describe the advantages and disadvantages of using plastic and timber fenders?
Define What materials were used to build the Golden Gate Bridge?
What is construction mitigation management?
Write short note on construction programme for pile foundation.
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
In cement making,what is meaning of blend,fineness,density.
Define What is Civil Engineering?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57