how you calculate the data (all parameter) after transient
response method i.e.pile intigrity test on pile.
Answer Posted / abhijit
1.by integration,
2.by static formulea
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
Why we provide hair pin for shed
What year was the keystone power plant in Indiana County constructed?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
How many cement sand ballast in cc 1:4:8 40mm
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
Explain what are the phases inspections are done by local authority while construction?
What is the diameter of the 3"inch nails?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how many type of admixtures for water stored structure?
How do you prepare Material Recovery Statement for deduction from contractors bills?
Explain the various stages of the project planning process in construction?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard