why microprocessors are named as 8085 ,8086 etc?
what's the reason for this???
Answer Posted / iamdon
The naming of microprocessor indicates historical facts
blended with technology improvements.
1)The microprocessor came in the late 70s(1976).This was close
to 80.so from here 1ST TWO DIGITS were taken.
2)There are 8 bits in microprocessor.Hence the 3RD DIGIT
was tkaen as 8.
3)Before 8085,8086 the CPU of intel corporation was 8080A
which were requiring +5V,-5V and +12V for functioning.
With the advancement in technology, it was possible to run
the microprocessor with single +5V.Hence the LAST DIGIT
were taken as 5.
This was the hidden message behind 8085,
(year)(bits)(supply voltage)
80 8 5
Author:arbelectbit@yahoo.com
Is This Answer Correct ? | 103 Yes | 33 No |
Post New Answer View All Answers
a simple c++ program to calculate simple interst with its data members as private
what are the differences between 'exhaust fan', 'heavy-duty exhaust fan' & 'super heavy duty exhaust fan'. what are their power ratings ?
IF % IMPEDANCE OF A TRANSFORMER IS INCREASED FROM 5.8% TO 8% HOW MUCH THE EFFICIENCY OF THE TRANSFORMER WILL COME DOWN?
How a band pass filter is constructed?
what is high and low cut off voltage of BB and DG at SPS????????
what is the difference between skin effect
66kv under ground cable how to layaing in ground any special case two ckt r runing
What is the permissable nutral current of three phase system as per IS standards?
I have a small system with two motors that are running on 380 vac, 60 hz. These motors are expensive and I usally get them from Brazil. I am adding another motor to the system, but I want to purchase a 480 vac, 60 hz motor to use. It will be on a VFD that is rated fro 380 thru 480. Is this posible and will I have to use a larger motor and derate it?
what is metering cum synchronizing panel and how it is used?
If I have 3 essential main switch board and 3 incoming electricity ,but only 1 genset running is that possible.
What are the Full Forms of TVM, MTL, CVT ?
how test transfomer(3 phase75kva) by megger
What is the meaning of utility ground and clean ground? How the distribution panel is grounded?
How many points does a Circuit can have?