Answer Posted / jigneshk
many parameters will be affected for enough testing
1.deadline of project should be completed
2.budget
3.testing done enough or say 80-90% fun testing covrage
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?
what is Test management fundamental?
MS Paint
How will you do beta testing?
Which of these techniques is not useful for partition testing at the class level Option 1 attribute-based partitioning Option 2 category-based partitioning Option 3 equivalence class partitioning Option 4 state-based partitioning
What is Mixed Testing
in an online banking software,users are connecting to bankserver by login.This login module can take below inputs for user. a/c number prefix-3 digits but doesnot start with 0&1 a/c number sufix-6 digits number password-5to 10 chars alphanumerics in lowercase areacode-3 digits number but optional purpose- cheque deposit money trasfer mini statement bills pay After filling above fields,user can click submit button to connect to bank server.prepare test scenarios for online banking s/w login.
What are the typical risks that you identify during test planning and their mitigation plan and Contengency plan.
*) Internal review defect gets detected… 1) During peer review. 2) By the own stuff member onsite/offshore. 3) During Informal review process. 4) None of these 5) All of these
hi this is satish can some one help me out by sending the maxium notes on client sesrver ,web server and company architechture project hirearchy and company hirearchy i will happy to recive the answers as early as possible
What is pesticide paradox?
Hi, this is not a tech question, i have 4 yrs of experience in Mainframe systems, presently as a mainframe tester in pune, i just want to step towards south locatios(preferable hyd), suggest me the best way to get calls from hyd.
What is the most important phase in STLC and Why
How do you scope, organize, and execute a test project?
How to test an Scheduled event? For ex: in an investment banking application, the scheduler will create an equity anbd user has nothing to do but tester has to test if the instrument is created properly or not?