Answer Posted / zaboor
Depends on Ratio of Concrete.
| Is This Answer Correct ? | 7 Yes | 6 No |
Post New Answer View All Answers
how we can find sieve #4 is 4.75mm?
For Wet Mix Mecadam design what is Optimum moisture content
How much for the BRC lapping in full yield and half yield < and which table to get it ?
How to find out slope footing concrete
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
How many feet are in 4 square yards?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What glue is least sticky?
Which are the top apps for you civil engineer?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
How can we convert weight batch to volume batch for m30 mix
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
how u design STAGING for Superstructure in BRIDGE construction?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?