please tell 1 ton equal to how many kilo watt?? in some
converter software's that is 3.5 kw. is it right?
Answer Posted / shahulsnfa
Shyam... energy can be converted into any form.. weight is
also energy when gravity is present...
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
How many types of colling system it trformers?
Fantio of tranformer
what is the use of piston rings in the engine used for a generator...........
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
what is meant by twilight switches 7 where its applicable ?
how do we calculate length of starting time and repeated starting of a direct online starter?
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
What are the specifications for conducting earth leakage test as per IEC standard?
What will be the diameter of pipe between conservation tank and transformer
can i able to get bhel previous exam question paper?
What is class ab operation?
PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
i have interview in Pepsi company what type of question will ask please send the question and answeer
A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .