Which state of India had first started power reforms?
Answer Posted / iamdon
The power reforms was first started in Orissa which came to
a crooper.
Author:arbelectbit@yahoo.com
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
why ct ,cvt should be stored in a vertical position?
sir i completed apprentice in TNEB.apprentice is eligible for 'c' licence
WHY DO VOLTAGE TRANSFORMERS FAIL DURING EARTH FAULT IN THE DELTA CONNECTED 6.6KV ELECTRICAL SYSTEM
Whats the difference btwn a latch, port,data bus buffer? Do they all not hold data in d flip flops??
how to test the electrical panel.ht lt mcc pcc.
if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.
tan delta equation test on alternators
What are the different types of LT Cables?
plz send me the placement interview question and answers of whizchip(technical and apttitude)..i have an interview in next.
at what rate the micro controller increment its timer....is it 1micro seconds or 1/(12*10^6) seconds
How to test lightning Arrester?
Can we use a absolute encoder to show rpm of a motor ? what about the condition when power is off ? what is difference if a incremental one is used ?abanirout@gmail.com
why Induction Generators are not "Black start" ? and apart from WTGs where this types of generator are generally used?
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible