can any body tell me integration between pp with fi,mm,sd.
Answer Posted / raghu reddy
SAP PP is part of the Controlling module thats why the
production execution transactiosn like CO01, CO11N, CO27
etc., begin with CO.
PP is with integrated with MM module as the movement types
like 261 (for backflusing) and 101 (goods receipt) come
from MM.
You cannot separate MM and PP. They are tightly integrated.
Batch management is also integrated.
ATP is integrated.
Handling Unit Management is integrated.
Subcontracting for external manufacturing is integrated
with MM and PP.
PP is also integrated WM (there is a config setting for WM-
PP interface.
Planning run is integrated between MM and PP.
PP is integrated with SD for requirement type, planning
strategies, item categories, ATP, MRP run etc.,
SOP, Demand management, etc., are integrated with SD
When it comes to MTO with variant config it is integrated
with PP and SD.
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Splitting of production order & product version
• How are basic order dates determined?
Which BOM item category you have used?
What is collective order. Pre requisite of the collective order?
Can any body explain me why work scheduling view is required for semi finished and finished products?
What is planned consumption and unplanned consumption?
What do you mean by basic dates
What is opening period?
What is costing? How it is affected the pp?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
Explain Availability check.
What is meant by payscale structure? How did you configure the payscale structure?
Explain the mrp controller and their uses.
What is Material status and which view of the material master it is available?
what are Standard keys