I have a difficulty in PGI.Whenever we do PGI,theerrors
occured that posting between these periods are not
possible.How i will overcome from that problem?
Answer Posted / jet
You need to ask FI user to open the posting period or you
post within open period.
To close/open period:
1. if by user than can through tcode mmpv to enter the
posting period / in configuration tcode is omsy, and to
display is mmrv.
2. in configuration
a) img - fin acc - fin acc global settings - doc - posting
period - define variant for open period.
b) img - fin acc - fin acc global settings - doc - posting
period - assign variant to company code
c) img - fin acc - fin acc global settings - doc - posting
period - open or close posting period. Here define the
period for D,M,A,S,K,+
if these all are set properly the you can post any logistic and
fico transaction.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
We want to explode bill of material automatically at time of order entry and explode an equipment bom in the sales order. What are the setting required?
What is the transaction code for creating a material in sap and what is the transaction code to extend a material?
Recently ibm asked what is tcode of sd cin?and what is the cond.type in cin?plz any one can clarify what should be the exact answer for this question?and if any one kind enough plz send me sd cin detail document in my email id nadnaps@in.com.
What are the responsibilities of a functional consultant in an implementation project?
What are the different lists in sap sd.
What are applets? How is it different from a reusable transformation?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
Is it possible to perform an availability check based on the plant yet exclude one storage location?
I have faced one issue: when i have to try creating miro in that one popup is came i.e. tax code vn in procedure taxind is invalid? urgent!
what happened when you overrate the customer?
List the basic elements of a customer master record?
What are the views in a material master?
To extend material one plants to another plant what are the configuration you done in your project?
If you generate bill more than credit limit then what will happen?
What is the function of Profit center in Material master and how will system react when it finds Profit center in MM/when it does not find Profit center in MM? Plz answer for both the scenarios?