ABCD is a rectangle with O as a point. AO=4 BO=3 OD=5 OC=?
Answer Posted / r
3*sqrt(2)
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
A, B, C, D, E, F, G, H, I are all of squares which are combined in a square. Area of B is 81 cm2. Side of A is 1 cm. Then find area of I?
A fold density is 19 times greater than the water and for copper it is 9 times.At what ratio you can mix gold and copper to get 15 times denser than water.
How will u print TATA alone from TATA POWER using string copy and concate commands in C?
Financial aptitude
one answer is 200/3 % it is perfectly correct wecannot recollec the prob. so place it blindly.
If Log2 x - 5 Log x + 6 = 0, then what would the value / values of x be?
In base 10 representation for a rupee 100 paise,then base 8 representation what is rupee value?
During the early months of 2009, some economists concluded that the slew of U.S. government programs created during the fall of 2008 to stabilize an economy marked by an absence of credit, a wave of enormous asset write downs, a precipitous decline in housing prices, and a historic loss of consumer confidence _________________ has not succeeded in engendering healthy intra-bank credit flows and reviving depressed equity prices has not succeeded in engendering healthy intra-bank credit flows and bringing about the revival of have not succeeded in engendering healthy intra-bank credit flows and reviving depressed equity prices have not succeeded in engendering healthy intra-bank credit flows and to revive depressed equity prices
From the below mentioned options choose the number that comes to 15 when divided by 4 and added by 9?
Imagine a rectangle.Its length=2*width.A square of 1 inch is cut on all corners so that the remaining portion forms a box when folded.the volume of the box is_____ cubic inches.find the original dimensions of the box.
Complete the given number series 240, 240, 120, 40,?, 2 ?
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
Can someone please send me the question paper for graduate level both tier 1 and tier 2 with detailed solution of maths exam (Tier 2). Please,suggest me the ways and books to prepare for this exam.Please, send this answer on my email Id
Let's say that you have 25 horses, and you want to pick the fastest 3 horses out of those 25. In each race, only 5 horses can run at the same time because there are only 5 tracks. What is the minimum number of races required to find the 3 fastest horses without using a stopwatch?
A,B,C,D,E are some numbers.if AB * CD = EEE and CD - A =CC THEN what is AB * D =? IN SAME CODE .