How to switch between two projects?

Answer Posted / yasobant badatya

Guys,

Amita's answer is absolutely correct.

If you have multiple projects under the same domain in QC
and based on the user authorization, you can able to view
the projects while you toggle between the Tools (link
available on the right side of the QC)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain about failure options in TD

1805


After creating the test cases in excel and exported to td. How does test director know the headings?

628


Explain the project tree in test director?

541


What is Test Director's API execution tool(VAPI)?

2734


how many ways are there to copy test cases in test director

2127






What is the difference between winrunner and test director?

577


can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released

2537


How many types of reports can be generated using testdirector?

615


Can you retrieve a test case once you have deleted them in test director?

626


How do we attach excel sheet with test director?

577


What is the purpose of (three)each view?

600


Can we export the files from test director to excel sheet? If yes then how?

593


How can we export multiple test cases from td in a single go?

597


Is it necessary to learn test director for beginners?

645


Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?

1718