What should be value of Circuit breaker operating time and
tripping
time?

Answer Posted / sunil solanki

circuit breaker operating time & tripping time should be in
ms.also tripping time should be less than operating time.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why reactors use before incoming of ac vvfd drive?

1574


WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???

2131


redundant connection in contactor?

2246


calculate external resistance values to add to the rotor of a slip ring induction motor. STATOR- 415 V, 3 phase delta, 1100 A, 50 Hz, 1490 rpm, pf 0,86 ROTOR - 660 V, 590 A, 50 Hz. STATOR current at each steps STEP1-600A,STEP2- 800A,STEP3-1000A,STEP4-1100A.

3302


a 230v transformer with step down ratio 19:1.it has 2000turns on primary and rated 25va calculate max primary current no of secondary turns volts/turn

1266


what is quality factor in series resonance circuit and calculate the factor of voltage magnification? how it happens?

1704


How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.

1750


Can the output voltage of a rectifier be greater than the input AC voltage without the use of any voltage multiplier in the circuit??please provide the explanation too..

1864


how much LT load can bear by the 100 KW HT connection.

1990


How we can defined theecopper cable size if we know the aluminium cable size?

1603


What are the commonly used schemes for the bus zone protection?

764


1.What is the range of stator resistance of 3-phase induction motor? 2.Two electrically operated vibro motors are foxed in parallel direction in vibrating feeders. what is the direction of both vibro motors?

1663


sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.

2683


What is the importance of counter based plan & how is it scheduled?

1759


HAI SENT HPCL APTITUDE QUESTION PAPER, MY EMAIL ID IS angus_eee04@rediffmail.com,angus_eee04@yahoo.com

1956