What is the step by step process in MRP
Answer Posted / shuvankar
Selection of plant.
MRP type
Model
Lot sizing
Planning calender
master data.
Finally run WRP1
| Is This Answer Correct ? | 2 Yes | 12 No |
Post New Answer View All Answers
Explain why a 'material master' is divided into views?
How would you convert multiple PRs in POs
Explain the types of gr blocked stocks in sap mm
Explain the types of project stocks in sap mm
What transaction code is used to convert planned orders (po) into requisitions in material requirement planning (mrp)?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What are the various types of master data in the mm module?
Explain how sd and mm are connected in sap?
What is the difference between contract and scheduling agreement?
Is it possible to activate split valuation after posting several transaction for materials?
Mention what is the transaction code used to extend the material view?
What are the types of industry sectors defined in material master data?
What are the main master files used in mm?
How is the vendor return processed without a purchase order reference?
Why gr blocked stock is necessary in sap mm?