Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

21. What is the purpose of taking Capacitance and Tan Delta
Test in
Transformer bushing?
22. What are the protections to be used for Generator?
23. Draw the vector diagram and condition for the
following: 1) Dyn1
2) Ynd0 3) YnYn0
24. What happens when the polarity changes in CT? Explain
briefly?
25. Explain the Term in CT Name Plate – Class: 5P10

Answer Posted / prasad

Tan DELTA TEST TO FIND THE Dielectric losses

Is This Answer Correct ?    5 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Differentiate between digital phase converter and ordinary phase converter.

1239


why would amp draw on neutral wire be as much as amp draw on the hot leg.

2093


Is there any rule to select the voltage of motor based on KW rating? What is the rating above which lt motor becomes the HT motor?.

1720


Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response

2921


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2818


will 1050kva DG set withstand for back charge of 16MVA transformer

1859


Explain the terms real power, apparent power and reactive power for ac circuits and also the units used.

1100


hi I have done 3 yrs diploma in electrical engg after 10+2. I have 16 years of work experience into design proposals sales and engg application development in LV/MV swithcgear and sub station automation field. I want to apply for immigration to new zealand but I am not sure whether I qualify or not since I dont have a degree. Can anyone advice? Thanks Riz

2285


What is the Temperature to be set in Thermostat provided in Marshalling box of the Transformer / Motor.

3024


can u tell me the promotion from oiller to enginer

1938


what would happen if reactive power (kvar)is increased (more)or decreased (less)? how much exact reactive power should be maintained? and what should be done for that

2266


How we calculate the current carrying capacity of H.T. cabel?

2253


iam working in power plant. In hot places tube lights are glowing at the end portion only. what is the reason for that?

1927


I WANT HOW CALCULATE TO CABLE FOR WELDING PLANT ?

1835


1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)

2297