Answer Posted / suresh ch
If u know levels take some value as datum, draw datum line and mark the level with respect to datum line and join the levels we will get profile of that road. we can draw profile by using graph or auto cad... suresh
| Is This Answer Correct ? | 18 Yes | 2 No |
Post New Answer View All Answers
What is the origin of name railway sleepers?
Which architectural movement is also known as jazz moderna?
What is the average density of soil?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
In Rcc ratio calculation I wanted to know quantity of Steel also.
What is binding spacing of the rebars at lapping zones.
what is tension footing?
what is the breaking strength of wall tiles
Describe Briefly The Various Methods Of Concrete Curing?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
load combinations how many types for staad design purpose?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.