Answer Posted / bunty chandwani
MPSC 2010 is scheduled on 20th and 21st of Feburary. The
last date for form submission is on 13th jan 2010.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How much of the strength of concrete comes from post- production curing?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
How many % we consider for lap for reinforcement for estimates
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Gidc technical que paper
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
what are the changes in concrete pour height as per IS 456, 2009?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
Which architectural movement is also known as jazz moderna?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
pls mail some more tecnical qustions at msaranya2610@gmail.com
What is the difference between a wood shake and wood shingles?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?