what is the difference between V model and Waterfall model
used in SDLC?
Answer Posted / neha shrivastava
V model satges:
1.component testing
2.integration Testing
3.System Testing
4.acceptance Testing
Waterfall model stages:
1.User Requerement
2.System Requirement
3.global Design
4.Detailed Design
5.Implementation
6.Testing
| Is This Answer Correct ? | 9 Yes | 54 No |
Post New Answer View All Answers
What is Dynamic Binding and Dynamic Loss?
How do you go about testing a project?
What is a test scenario?
What is the difference between pilot and beta testing?
why testcases are written and what is the importance?
Difference between Stakeholder and Relevant Stakeholder?
Write 2 scenarios for System testing?
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
Diffrernce between client server testing and web server testing.
Write down ten test cases for below scenario: Increase the day by 1 and date format should be mm/dd/yyyy Conditions are : date should not be greater then 31 and date<1 month should not be greater then 12 and month<1 year should not be greater then 10000 and year<1 Thanks in advance
What does entry and exit criteria mean in a project?
Hello, I want to know how to write a regression test plan? Can someone please send me the format/template? Thanks in advance
Hi Can any one tell wht type of questions will be asked in project manager round...urgent plz...
Does anyone have any good examples of some acceptance criteria for non-functional requirements?
Have u ever done testing related to a database,give examples to support u r answer.