Answer Posted / sri
it also provide earthing to the the circuit while glanding
and eacts as extra protection and also for mechanical
damages
Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
How we select the vector group of 3phase power transformer?
what is mean by drives?
why actual valve timing diagram is different than ideal valve timing digram of a 4 stroke engine?
PLZ EXPLIN ABOUT CLASS PS CLASS CT .WHY THEY R DESINED AND FOR WHAT PURPOSE?WHY OTHER CT CANT BE USED AS PS CLASS CT? EXPLAIN IN SIMPLE LAUNGAGE IF POSSIBLE PLZ GIVE CIRCIT DIAGRAM?EMAIL-RAJ_SINGH_0376@SIFY.COM
Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors
How to test the vector group of a Yd11 transformer? what are the relations to be checked between various vectors to confirm this vector group?
1 Ton is equal to how many watts?
how can we make cable shedule for controll wiring ? which details must be required for it.?
Can we use 230VAC, 63A MCB for 120VAC, 63A supplied heaters load?
WHAT IS IM (INDEX OF MOUNTING )IN MOTORS
I completed iti in2004 I was worked in A grade contractor can I get c licence
Difference between rating factor of cable and derating factor of cable?
how does this job compare with others you have aplied for?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
Why 9KV surge arrester having 7.65KV of MCOV?