how rating of transformer is selected for any new
plant/what kind of load is cosidered/what kind of fadtors
are considered/ pz give standard procedure
Answer Posted / rajeshsan
The rating of Transformer is sized based on many factors:-
1. Total load demand
2. Design margin
3. Continuous load with certain margin with intermediate load
4. In case of Thermal Power plant, Factors like Worst coal, Test block condition for Worst coal..
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is the principle of operation of CFL ??
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
what is the reason for indication of light in the earth lamps of main switchboard.if there is an earth why does one lamp get dim and the other two bright.
how to calculate cooling requirement of datacentre from electrical load?
any one guide me to reduce the power factor of diesel Generator from 0.97 Leg to 0.8 Leg.with out any change in my load.
hai iam arunkumar. i have applied for an section enginner in rrb. i want lat 5 years solved question papers. if u have please sedn it to arun30682@gmail.com
Can anybody tell abt concrete encased earthing or grounding?
Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.
what is sevice settings for mccb?How can be it setted?
Define availability (operational)?
Why IR value of the (HT cable Plus synchronous motor) is less while individually having IR values in GΩ?
What do you mean by Frame 5 Gas Turbine as well as Mark II.
what are the pecularity of shaver sockets ?
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
What is dynamo?How it works and what is the function of dynamo in a DG.