Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the resource block mode in foundation field but ?
what is advantages for this

Answer Posted / ahmed

This block provides the common shared use withe other two
blocks.i.e transducer block and analog input block.also
called functional blocks.rersource block in otherway it
manages nonvolatile memeory

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please send me the inteview questions in IOCL

2238


what is function of switch, and how is it work, explain with difination

2371


what is use of communication wire in multipare cable(oil and gas field), why this communication wire not used in single pair cable?

2164


what is Best Among SINK Or SOURCE Type Design In Digital Signal, Either Iput Or Output? WHY?Can any one..

2152


Why upper weighing limit of electronics balance is 90% of the total weighing capacity?

2198


Senior engineer's please help me, what is Loop Checking and Loop test? and write difference also? soon urgent

2107


Please can anybody help for control valve sizing step by step procedure?

2127


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2174


hello sir/madam, I,Subramanian need 5yrs placement papers of officer trainee of Instrumentation technology.pls send to this mail id mani_nxtgen@yahoo.co.in please do the needful. with regards, subramanian.v

2219


How do you identify an orifice in the pipeline?

1258


how to calculate signal cable sizing? and multipair cable sizing??explain in brief?

2351


what is a half wave, full wave, and bridge rectifer.

1782


what is the protection system in solar turbine compressor

2199


What is standard procedure of manual mapping in Radar type level transmitter?

1950


how to work MIL contol valve posistioner ?