How to convert n/mm2 in to kg/cm2?

Answer Posted / souvik

1 n/mm^2= (1/10)/(1/10^2)kg/cm^2
= 10 kg/cm^2

Is This Answer Correct ?    183 Yes 39 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

1977


What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?

1615


i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr

1555


When column of building is abutting the boundary line,then suitable footing advised is

1963


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1022






What is passive earth pressure ?

728


Write short note on construction programme for pile foundation.

4974


what is project?

1927


115mm thickness brick work how to required mortar

1634


What are the advantages of cad software’s?

684


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2372


Stringer How many cm goes to landind

1219


how to tie 10 legged stirrups

5899


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2513


construction workers how much time take one work or qty

1133