1)What is ur project architecture ?
2)how to move project from developement to uat?
3)What is the difference between datastage 6,7.1 and
datasttage 7.5?
4).How to do error handling in datastage?
5)3.Whta is unit testing, system testing and integration
testing?
6)What is the Exact difference between BASIC Transformer
and NORMAL Transformer?When we will go for BASIC Or NORMAL
Transformer
7)why we use third party tools in datastage?
8)What is the purpose of Debugging stages? In real time
Where we will use?
Answer Posted / nisha
4) Error handling can be done by using the reject file link.
what are the errors coming through job needs to be caputure
in sequential file and that file needs to be fetch in job
which will load this exceptions or errors in database.
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how
How to write a expression to display the first letter in Caps in each word using transformer stage ? Please let me know ASAP Thanks in advance...
what is 'reconsideration error' and how can i respond to this error and how to debug this
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
Describe the architecture of datastage?
What is oci?
What is active and passive stage?
How and where you used hash file?
What are the types of views in datastage director?
Why fact table is in normal form?
What are the main differences you have observed between 7.x and 8.x version of datastage?
How to perform incremental load in datastage?
What are stage variables and constants?
What is the precedence of stage variables,derivations, and constraints?
Highlight the main features of datastage?