1)What is ur project architecture ?
2)how to move project from developement to uat?
3)What is the difference between datastage 6,7.1 and
datasttage 7.5?
4).How to do error handling in datastage?
5)3.Whta is unit testing, system testing and integration
testing?
6)What is the Exact difference between BASIC Transformer
and NORMAL Transformer?When we will go for BASIC Or NORMAL
Transformer

7)why we use third party tools in datastage?
8)What is the purpose of Debugging stages? In real time
Where we will use?

Answer Posted / nisha

4) Error handling can be done by using the reject file link.
what are the errors coming through job needs to be caputure
in sequential file and that file needs to be fetch in job
which will load this exceptions or errors in database.

Is This Answer Correct ?    6 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the different type of jobs in datastage?

583


What are the different options associated with dsjob command?

948


What are routines in datastage?

783


What are stage variables and constants?

709


Define ds designer?

772






Differentiate between validated and Compiled in the Datastage?

654


Describe the main features of datastage?

662


I/p : F1 table have A,B,C,D,E and F2 table having C,E,V i need output 0utput1: ABD output2: V any one suggest me this

554


What are the functionalities of link collector?

632


i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS

3323


EXPLAIN SCD

973


What is usage analysis in datastage?

827


What are the steps required to kill the job in Datastage?

693


What could be a data source system?

582


What are sequencers?

618