Why we are checking the vector group & turn ratio of
Xformer while PM?
Answer Posted / m.k.k
we don't check these things during pm. it is done during
commissioning time only
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what is the use of surge suppresser in 33 KV incoming panel. where it must be installed,inseries with incoming cable surge suppresser must be at incoming of the breaker are outgoing of the breaker
Explain with example of functional requirements of protection relay in terms reliability, selectivity, sensitivity
How to decide cable tray size?
What are the specifications for conducting earth leakage test as per IEC standard?
Why have to use copper cable for local isolator to motor ?
What is electrical diversity factor in electrical installations?
What are the limitations of Kirchoff's laws?
Difference between On Line capacitor and Station Type capacitor.
why do we lay up the core of a cable?
explanation of mesh bus bars
how to find out 3 phase complex power in per unit in unbalanced system?
I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?
At full load wat is the motor p.f And at no load will is the motor p.f?
what is the use of piston rings in the engine used for a generator...........
What is the angle of inclination for the oil connection from transformer conservator to Bucholz relay and why?