1. What is the difference between a bug and a defect
2. What is the difference between retesting and regression
testing
3. Explain bug life cycle
Answer Posted / eng. haider hardan
Ans1)
Defect: error appearing but doesn't mentioned in the requirements.
Bug: Any thing doesn't match the requirement.
Ans2)
Retesting: do same test again. when we said retest the project which is mean detailed test for this project.
but when we do a retest for a bug this is called resgression.
Regression test never done befor bug become fixed
Check if it is fixed by the developer or not.
Ans3) Bug Life Cycle
Tester find a bug-->New (open) --> Assign to QA lead or Dev Lead
QA lead --> DEV Lead
DEv Lead --> Devloper
Dveloper --> (Fix | Not Abug | Later | More Info | Invalid)
ReAssign --> Dev Lead --> QA Lead --> Tester
Tester --> recheck --> close or reopen
If it Reopen --> repate all above proccess
QA open (new)-->Dev Maintinace (Fix|not abug|etc.)--> QA regression (Close | Reopen)
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What is Operational testing?
How to generate swift message
What if there is not enough time for thorough testing?
Plz post any critical bugs found while testing desktop application.
what is Conventional SPMs
How to find all the bugs during first round of testing?
What are the automation challenges that sqa(software quality assurance) team faces while testing?
What is the difference between quality assurance (qa) and quality control (qc)?
In asset accounting we are run depreciation in 10% now we are in 6th period . But now our client says that the depreciation percentage is 12% but we have wrongly calculated on 10%. So what are the process we have calculated actual percentage.
What is the difference between Outsourced Testing and Crowdsourced Testing
hey, i recently attended 2 interviews and they asked whether I used qamonitor of softsmith. any help on what it does?
According to you, when is the good time to start qa in a project?
What is process area in cmmi?
Explain the difference between quality control and quality assurance.
How do u calculate Schedule variance? What is the formula? Explain with Example