-what is the meaning of M.S.L for civil field?
-what is the grade slab and suspension slab?
Answer Posted / sumersingh m pakal
M.S.L. is the abrrivation used for men sea level. In India
the mean sea level is adopted as Karachi (Pakisthan).
Is This Answer Correct ? | 9 Yes | 6 No |
Post New Answer View All Answers
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
How can i do RCC rate analysis?
List out some of the software program that can be useful for architect?
to minimize budget cost of building , what can i do
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
what is the difference between natural draught cooling tower and induced draught cooling tower
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
what could be the production cost of 1 cum of concrete by CP30 plant
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
how do we design mix ratio?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What are the steps involved in the concreting process?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)