What is the difference between quality assurance and
quality control?

Answer Posted / nirmalanand

Quality Control refers to quality related activities
associated with the creation of project deliverables.
Quality control is used to verify that deliverables are of
acceptable quality and that they are complete and correct.
Examples of quality control activities include deliverable
peer reviews and the testing process.

Quality Assurance refers to the process used to create the
deliverables, and can be performed by a manager, client, or
even a third-party reviewer.

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which is the best testing model?

610


What does 100% statement coverage mean?

1823


When did u complete testing ? Which scenrio should not be in automation testing ? why ?

2403


Hello again!! wanted to ask you HOW EXACTLY create stubs and driver in integration testing? 2.whats the difference between integration testing and system integration testing? Thanks!!

1719


What is the purpose of test strategy?

703






Can anyone tell me about banking project? abt the transactions? the flow?

1531


Do submit teststrategy to customer if yes at what time

1566


On what basis you are fixing up the time for project completion?

791


What is QCM?

1789


What are the typical risks that you identify during test planning and their mitigation plan and Contengency plan.

2015


tell me 5 new requirements in ur project? plz urgent

1970


how deployment phase of SDLC differs in product based and in service based company ?

2552


What is the responsibility of programmer’s vs QA?

1826


i need some objective type papers for my certification

1769


1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?

1877