In APFC panel, Why on dealy timer is used in Capacitor
controlling circuit?

Answer Posted / vasudevan

In APFC panel delay timer is used to add the capacitors in
steps. Based on the reactive power factor and export power
factor requirement, capacitors are added as per the time
delay.

Is This Answer Correct ?    12 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please sent me some previous year question papers of BSNL-JTO telecom and RRB in ELectrical Engineering to varshashahi@yahoo.com

1569


Why we find the sensitivity for the CT's to check?

1421


What effect does a very low impedance have on the Voltage regulation? On the short-circuit current?

5834


How will you utilise electrical power? You can start from the generating station.

1457


whatare the disadvantages occur,if the form factor of transmission will not be equal to 1.11

1439






which type of effect of turbine and generator reverse power protection ?

3762


A 230V dc shunt wound motor has an armature resistance of 0,15Ω.When operating on no load at 650 rev/min the armature current is 6A . The motor takes a full load current of 85A. Calculate the full load speed if the field flux is (i) maintained constant (ii)reduced by 0,03

1599


how the B-H loop obtain under the static condition

1824


Why does the speed regulating system adopting I controller have no steady-state error? In this single closed-loop speed regulating system, when the input of the I controller Un=0, what is the output voltage of the regulator? What factors do the output voltage depend on?

1424


Shall I use 40A semiconductor Fuses in 32 A SFU ? Frame size is same. What Happen if Fuses burn on SFU?

1631


We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's

1453


(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?

1596


what is LSR?

1723


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1467


how to select rating of HT Panel

935