Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to checking sld drawingas and control drawings

Answer Posted / mds khan

Slds represent 3 phase drgs, so everything will be tripled
and compared while control are traced as it is.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)

2365


How Self works in DG set

2107


why and how voltage sharing in transformer, during magnetic balance test ?

2395


Why we use duplex coil and hook switch in telephone system?

5086


what is the difference between active power and reactive power and apparant power in practical as well as theoritical

1996


What is the rating of a circuit breaker needed for 300 kv load in 33KV supply line of 33/415 transformer ? Whether 800/1200 amp vaccum circuit breaker can perform for a 33 KV line in input in 415 volt in output of the transformer ?

1723


How it can worked plc based electrical system And which type of software using.

2153


hey guys help me out.....what  are the industrial uses/functions of nozzles in industries 

1647


What are conduct on the testing in cf in ur site?

1709


I want to do a mini project. Now I'm studying in 6th semis tor EEE Engineering.

2202


when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//

2089


Discuss about gear cutting machines.

1257


Explain Energy and Power signals?

1812


Is it required to lay GI wires along with GI/MS conduits from one point to another point though separate earthing cable is conncted from DB to Socket?

2044


what happen if the load connected to the induction motor is taken away? the same question for synchoronous generator in synch i think that the the exitation voltage will appear on the terminal only if so plz answer me

2058