how to calculate steel columns beams and slab please give
me brief calculation
Answer Posted / ehsan
Approx, 1.5 to 2% steel in columns, 1 to 1.5% in beams & 0.7
to 1% in slabs (%age of Conc.)
if concrete is 100 cum in Column.
than we take min 1.5% and max. 2% steel.
It will be 1.5 cum to 2.0 cum steel.
1.5x7850= 11775kg/cm3 (min.)
2.0x7850= 15700kg/cm3 (max.)
(7850 is density of steel per cum)
| Is This Answer Correct ? | 56 Yes | 32 No |
Post New Answer View All Answers
what is stressing
cement and sand required for one block of size 0.23*0.15*0.46
what is the clear cover for shearwall?
What is the Roll of Water Bonding under VDF road?
why we use 19x9x9and 20x10x10 but not other
How is the leaning tower of pisa supported?
how to calculate the steel in 500yard
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
What are the advantages of cad?
Define What is passive earth pressure ?
what is the dimensions of river sand truck trailer or trolly ?
What are the applications of modulus of elasticity?
What is the different type of slump test indications?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.