can we run a motor rated 50Hz,415vac,1440RPM At higher speed
then rated on name plate with the help of VFD /drive on long
term basis.wheater it will effect the motor life
Answer Posted / venkatesan.j
Yes the motor can be run above the rated speed through a
VFD ,but it depends upon the manufacturer specification how
much duration and how much it can be raised.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
in non technical way how can u define POWER FACTOR??
Define Electrical Insulation and examples of Solid,Liquid and Gaseous insulating materials?
what are the industrail measures to over ferranti effect? how would the ferranti effect the power system if those remedial mearsure arent taken? how often does this effect occurs in real power system?
how to calculate the size of the HT cable
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???
What is center gravity load in substation?
Cables Construction hi friends, 0.6/1/1.2 kV LV , DC and Control cables are concentric copper conductor what does its means and what is the use of concentric copper conductor,and are this with copper tape shield or copper screening, ? thanks
WHAT HAPPENED DC SERIES MOTOR FIELD WINDING OPEN. CAN POSSIBLE.
ROC converges if poles and zeros lie inside a. Origion b. Z=1
How to calculate the sag of OPGW during stringing???
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
how a flip flop can be used as a latch?
How much ph is maintained of water electrolyte which is used in LRS for 1200 kw slipring induction motor ?
1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to confirm its base capacity?
how generator load test is conducted?what are the steps?