Answer Posted / sri
droop indicates the sensitivity of the machine .
droop persentage indicates the RPM required to increase the
load from 0% to 100% .
| Is This Answer Correct ? | 18 Yes | 7 No |
Post New Answer View All Answers
if 6 earth pit value is 1.5 ohm then what should be the number of earth pit to make the value .8 ohm
what is the power factor used by the PHCN in nigeria? 2. what is the difference between an alternator and generator. 3. Generation of poweris in KV but how is transmission is in MW. 4.If the transmission of power is 20,000MW how can it be increaesed to 80,000MW
Explain in brief description about the operation of DG sets.
What is the most accurate way of testing ELCB?ELCB is better than RCD?
What are the basic & Majour problems in UPS ?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
A Question Like A Wire Is Wound Whose Resistance Is Some 132. 44647 Ohms. If A Voltage Of 30 mv, 296 Ma Current Is Applied To It What Is The Resistance.
WHAT IS DIFFERENCE BETWEEN MANUAL CONTROL AND MAGNETIC CONTROL AND STATE ITS ADVANTAGE /DISADVANTAGE
Explain the working of variable frequency transformer?
what are the applications of transistors with low dc gain, high dc gain and medium dc gain( beta)?
is that any software calculator to calculate the size of cable
how you will decide the distance between the power transformer and its fencing
What happened if C.T mount at any cable or Bus bar in wrong direction . C.T going on proper work or not . C,T direction is essential thing to properly work.
how does an centrifugal and screw type chiller will work. which chiller efficiency is high and why.
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,