Answer Posted / rajan
r.r.patil
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
A person spending out 1/3 for cloths , 1/5 of the remaining for food and 1/4 of the remaining for travelles is left with Rs 100/- . How he had in the beginning ?
A family I know has several children. Each boy in this family has as many sisters as brothers but each girl has twice as many brothers as sisters. How many brothers and sisters are there?
A man said to woman " your only brother's son is my wife'sbrother". How is the woman related to the man's wife..
1/3 of girls and 1/2 of boys is goto canteen. What factor & total no. of class mates goto canteen.
complete the series: x y z u v w r s t __
How many different 9 digit numbers can be formed from the number 223355888 by re-arranging its digits so that the odd digits occupy even position?
7 students can complete a task of making 9 scientific models in 21 days. How many students can make 3 models in 14 days.
sir, ihave cleared my ssc so(acctts) written exam i want to some tips for interveiw
two trains are 2 kms apart. Speed of one train is 20m/s and the other train is running at 30 m/s. Lengths of the trains are 200 and 300m. In how much time do the trains cross each other?
1) 1)difference between ip and non ip protocol.
a student is ranked 13th from right and 8th from left.how many are there(similar)
If x and x+10 are lengths containing right angle, what is the equation if area is 24 sq.cm
A small town's industries have a total turnover of Rs. 25,00,000. If the town council plans to raise Rs.170,000 through octroi levy, what % levy should it charge on the industries?
Jack and Jill went up and down a hill. They started from the bottom and Jack met Jill again 20 miles from the top while returning. Jack completed the race 1 min a head of Jill. If the hill is 440 miles high and their speed while down journey is 1.5 times the up journey. How long it took for the Jack to complete the race ?
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?