The 4 main factors to start a construction project are––
What is thumb rule in quality and quantity estimation of a Residential building??
any book or article on pumped concrete.
what is diffrence between catchment area,watershed and basin?
What is difference between combin footing & rapt footing
what is the minimum compressive strength of clay brick
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
What is need for setting limits?
What is passive earth pressure ?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
how to calculate total cost for slab 35'×8'
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
How high should the water tank be to provide a 60 psi at base of this water tower?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.