Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

# 1. Size of slit content in sand.
# 2. Gravity of sand
# 3. Water observation capacity of sand.
# 4. minimum crushing Strength of sand.

Answer Posted / suresh

it is not specified in the relevant code (IS:383) about
silt content, instead it is said that the particles finer than
75 micron.it should not be more than 3% in natural or
uncrushed sand whwre as in crushed sand it is allowed upto 15%.
the gravity of the sand varies from 2.6 to 2.8.generally taken
as 2.65.
water absorption capacity of the sand varies between 0.5 and 1%.
the minimum crushing strength of sand or aggregate should be
80 N/mm^2.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1521


why we use aggregate,sand with cement in concrete?

9871


Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions

2329


acceptance criteria for concrete works

2201


How to do bbs in excel format

2205


How long does it take concrete to harden?

1169


How can i do RCC rate analysis?

1694


List out the types of roofs?

1162


what is the service corridor?

2387


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

2040


What are some facts about concrete?

1170


what do you mean by yeild stress of a material? What will happen when hit is given to cement?

2350


What is semirigid connections?

2156


what else we can add rather than admixture in concrete to reduce the cement quantity?

6198


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1699