is a transport route bidirectional?can you transport
requests generated during client copy(scc8)from production
to dev?
Answer Posted / vinvk
dear hameed ,
let me explain what exactly is my doubt.
I think we can do client copy from prd to qas using client
export-import.I dont want to use remote method.
the procedure is to export the prd client through scc8 and
import these requests into qas client through stms.
now isn't it transporting request in th opposite way?
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Have you done any parameter changes using configtool and visual admin tool?
What is R/3? and what is basis version?
Can you change the profile parameter in the os level? Which one is advisable why?
Hi Shridher, Would you please send me an SAP CRM question and Answer to siri.testing@gmail.com Thanks, siri
How can you find a list of objects that have been repaired in the system?
Explain how you can restrict multiple logins of user in sap? What are the thing you have to take care of while writing the id’s?
How to check CPU usage in EP? If java path is down the how to do trouble shoot? What is the transport group? What is the SLD system in PI? How to take back up in EP? How to create logical system? Is it possible to change the name logical system in SSC4? How you will take the online Backup and incremental Backup? What is the backup strategy? How many application servers you have in Production System? Difference between oracle 9i and oracle 10g? What is EHP4? What is your enhancement package and support package? how to find RAM size on Unix? How to find OS level at command Prompt? While doing kernel upgrade what is exe files? What is client comparison? How to apply job on Os level? What are the recent challenges faced? How to apply support package in solution manager? Difference between SPDD/SPAU If SAP* is not working ? If job is slow? how you will trouble shoot? What are software files required for SAP 4.7?
When we are doing cash sales, free goods and discount, How many pricing procedure do we need to create..? Only one PP required or have to create multiple PP..? and how many condition type we need to create..?
i want my company code and controlling area defaut as 'ABC" through out SAP what to do ? and my plantcode also default to some value
What is the use of profile paramater ztta/roll_area?
Mention the use of personalized tab and parameter tab in user master record?
What are the daily activates?
What is transport layer and domain controller? In which system you have create domain control?
What are the activities you done in EP?
What are the DVD's Download for implementation?