specify three views for which formulas can be entered.(work
center)
Answer Posted / pravin mandgaonkar
In follwing three views of Workcenter ,formula can entered.
1.Capacity
2.Scheduling
3.Costing
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is the use of data in work centers?
Checkdigit example
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
Explain Flexible planning Procedure?
List out the basic procedure for dispatching operations in capacity leveling?
How is indian slab and us slab?
What is mrp group and what is the use of it?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is mrp controller means?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
Where have we to specify the teardown time in one operation?
What are dynamic actions? Give a few examples. What are it’s you used in them?
Integration between PP and PM module.
Explain LTP.
What are the types of MIC?