Answer Posted / sidharth
"U" means you - to give honour/ respect to the second person
"I" if you are confident
| Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
Explain what is 1/8 on the architect ruler denotes?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
Define relative co-ordinates?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
what is mc arther pile?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
what is the minimum compressive strength of clay brick
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
What are the composition of a landfill?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?