Answer Posted / priya
Civil engineering is a professional engineering discipline
that deals with the design, construction and maintenance of
the physical and naturally built environment, including
works such as bridges, roads, canals, dams and
buildings. ...
Planning, evaluation and constructed infrastructure of
facilities and buildings, transportation systems, water,
earthworks, and other structures. ...
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
Why steel rods are produced only in even dimensions?
how to calculate total cost for slab 35'×8'
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
how to calculate the steel in 500yard
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
(Project Management Topic) What are the important criteria in the successful realization of the project?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
how many litres of enamel paint required for 5000 sft of site??
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
How to calculate brick work quantity?? Block work quantity??