explain about earth quake zones? Chennai falls under
which zone
Answer Posted / sjtbehera
India has divided in to four diffrent zone as per force
acting by earthquake. from zone-1 to zone 4 is lower to
highest.
zone III-Ahemdabad, Vadodara, Rajkot,
BhavnagarSurat,Mumbai, Agra, Bhiwandi, nashik, Kanpur Pune,
Bhubneshwar, Cuttack, Asansol, Kochi Kolkata, Varanasi,
Bareilly, Lucknow, Indore, Jabalpur, Vijaywada, Dhanwad,
Chennai, Coimbatore, Manglore, Kozhakode ,Trivandrum.
Zone IV :- Dehradun, New Delhi, Jamunanagar, Patna, Meerut,
Jammu, Amristar, Jalandhar.
Zone V:- Guwahati and Srinagar.
| Is This Answer Correct ? | 13 Yes | 5 No |
Post New Answer View All Answers
how to calculate weight of 1.8 cum of aggregate
Ratio for 4500 psi concrete
what are the changes in concrete pour height as per IS 456, 2009?
why is the column design?
Define What is rigging?
How do you measure water flowing through 300mm diameter pipes?
How can you achieve soil enforcement?
why we are using stub column..? is it possible to construct steel stub column..?
What is OSHA compliance?
What are the applications of the modulus of elasticity?
What is the difference between shear and tensile strength?
Why concrete barriers have curved surface profiles?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.