Why I-section is preferred to channel section?
Answer Posted / xyz
sherar centre pass through flange,and its also symmetric
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How much percentage of brick bats allowed in CD-75 bricks
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
How to estabilish reinforcement Steel rolling margin for a building projects ?
Which is the direction of negative angle?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
How is the strength of cement measured?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Describe the sections included in a typical bill of quantities
what is the calculation of raw material for 0.35cum of m-15
what is the ingredient value of 40mm and 20mm aggregates?