What are the factors to be considered during the
Synchronization?
Answer Posted / ganesan.n
1. Phase sequence must be the same,
2. Voltage Must be the same,
3. Frequency must be the same.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
why we r not earthed Control cable of C.T. terminals
for 100 HP Induction motor service factor is 1.2(SF) we placed a VFD at the motor side load is balance with 0.3 Amp's Phase to Phase but at incoming of VFD load is un-balance with 10 to 20 Amp's what will be cause of load un balance
Why computer humming sound occurred in ht transmission line?
draw singleline diagram of star to delta and dol starters
Why neutral point is consider as zero potential?
I have two PLC processors. I want to communicate both processor with each other. How i can do so?
what is meant by LCR meter? where its useful ?
Capacitor is load free component but why ampere meter shows current when capacitor bank breaker close?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
what is the importance of earthing system on the generators big capacity and small?
Which standard we are following earthing resistance test
What are the roles and responsibilities of electrical engineer in cement plant
If the rated speed of a d.c. Shunt motor is1440 r.p.m, which method of speed control would you suggested to obtain a speed of 1500 r.p.m?
What are the factor to be consider for CT selection in 132kV substation?
how much cable size required for 70 kilowatt load.